I. Legacy system access post Banner
1.
Enterprise Systems - changed to READ-ONLY after “go live” date.
Access will be limited to specific end-users for a limited time period.
2.
Data Warehouse (referred now as Operational Data Store) – preserve
last day snapshots after Enterprise System changed to read-only. Access will be
limited to specific end-users who require access to the data.
II. Options for additional data requirements after “go live” date
1.
Create new Operation Data Store extract. Feasibility of a requested
extract will be determined on an individual project basis.
2.
Archive manually to a storage medium (not E-Print). Examples include
copying data to a CD.
3.
Create a new job with output saved to E-Print.
4.
Use Imaging to capture data.
III. E-Print issues under Banner
1. Currently at 72% capacity and not
sized as an archival solution. Do we re-size?
2.
Currently have one test and one production server for SCT Plus. Under Banner we
will require a Banner E-Print production environment. Do we purchase another
server for the Banner production environment?
3.
E-Print hardware is aging. Plans are in place to replace the hardware. |